BP now capturing 16k barrels/day at Deepwater Horizon | Process Engineering | The Engineer - http://www.theengineer.co.uk/channel...
Jun 13, 2010
from
"The investigation earlier uncovered “significant problems” with the BOP - the supposedly fail safe system installed to cut off the flow of oil and gas to the Deepwater Horizon drill rig."
- Tracy
Have you run through your disaster recovery plan lately? Quite a long list of reasons why the fail-over might not have worked, including a dead battery.
- Tracy